Timber and glass house at dusk among pine trees

Services / New homes

From a bare lot
to the keys.

Design, permits and build under one contract, with one site manager from the first trench to the last coat of paint.

$420k+

Design and build, from

11 mo

Typical time on site

3,400

Typical square feet

10 yrs

Structural warranty

01 · Design

Drawn around your lot.

Our designers start with the site: slope, sun, views and setbacks. You see a model before you see a price, and the two are worked up together.

House design shown as a line drawing, a white model and a finished render

02 · Permits

We file everything.

Building permit, engineering and utility applications are part of the contract, not a favour.

Building permit

6 to 10 weeks in most Front Range towns

Engineering

Stamped drawings included

Utilities

Water, sewer and power applications

03 · Build

One crew, one programme.

Your site manager is on site every day and sends a written report every Friday.

Timber frame up on site
Site manager reading drawings on a building site

04 · Handover

Keys on a Friday.

✓

Snagging walk-round with your site manager

✓

Warranty and appliance paperwork in one binder

✓

30-day and 11-month visits already booked

05 · What it costs

Three real examples.

3 bedrooms, 2,200 sq ft

Standard finish on a flat lot

From $420k

4 bedrooms, 3,400 sq ft

High finish on a sloping lot

$980k to $1.3M

Custom

Engineered structure and premium finish

Quoted

New homes we have built

Walk round one
before you decide.

Got a lot, or looking for one?

We will walk it with you before you buy and tell you what it costs to build on.

Office open Monday to Friday, 7 to 5

Got a lot, or looking for one?

We will walk it with you before you buy and tell you what it costs to build on.

Office open Monday to Friday, 7 to 5

Create a free website with Framer, the website builder loved by startups, designers and agencies.