Renovations
Down to the studs, if needed.
Kitchens, bathrooms, whole floors or the whole house. We open the walls before we price, so the number holds.
From
$45k
Typical time
6 to 12 weeks
Investigation first
Always

Three sizes of renovation
One room, one floor, or all of it.

01
From $45k
Kitchen or bathroom
New layout, cabinets, tile and services in one room.
View service →

02
From $120k
Whole floor
Walls moved, new services and finishes across one level.
View service →

03
From $280k
Whole house
Down to the studs and back, usually in five to seven months.
View service →
In the price
From the first cut to the last coat.
No provisional sums for things we can measure. If we can see it, it is priced.
✓
Opening up and investigation
✓
Structural changes, engineered
✓
New plumbing and electrics
✓
Insulation and drywall
✓
Cabinets, tile and fixtures
✓
Floors and decorating
✓
Permits and inspections
✓
Final clean and snagging
No surprises
We look before we price.
Old houses hide things. We find them before the contract, not after.
01
Walls opened first
We cut inspection holes where the risk is, before the quote.
02
Lead-safe crew
Certified for pre-1978 houses, with dust controls from day one.
03
A fixed price that holds
What we could see is priced. Nothing is left as a guess.
Questions
About renovations.
What if you find something behind a wall?
−
We tell you the same day and price it in writing. Most of it is found before you sign.