Five kitchen layouts that work in a narrow house

Elena Ruiz
Site manager
·
21 October 2026
·
7 min read

In a house under twenty feet wide, the kitchen layout decides whether two people can cook at once. Five layouts work well.
The short answer
Galley, single wall with island, L shape, U shape and peninsula all fit a narrow house. Which one works depends on where the windows and the garden door sit.
We have built each of them in Denver row houses and bungalows in the last three years.
Layouts and the width they need
Galley
Two runs facing each other
8 ft wide
L shape with table
Corner run, table on the open side
10 ft wide
Single wall with island
One run plus a 3 ft island
12 ft wide
What to decide first
Settle these four before you choose a single cabinet.
✓
Where the sink goes, usually under a window
✓
How many people cook at once
✓
Where the door to the garden lands
✓
How much storage you need outside the kitchen
“Move the sink to the window and most narrow kitchens solve themselves.”
Three real examples
Larkspur kitchen
Galley with a window sink, Boulder
$86,000
Maple Street extension
L shape onto the garden, Denver
$186,400
Juniper Court
Single wall with island, Littleton
New home
What we avoid
Islands without 42 inches of walkway on each side, and corner sinks. Both look fine on a plan and are hard to live with.
How to get a layout for yours
Book a site visit. We measure, sketch two layouts on the spot and price the one you pick.
Keep reading


