What a rear extension costs in Denver this year

Nora Whitcomb
Project director
·
4 November 2026
·
6 min read

A 420 square foot rear extension with a kitchen costs between $180,000 and $230,000 in Denver this year. Here is where that range comes from.
The short answer
We finished 41 rear extensions in the last two years. The smallest came in at $142,000 and the largest at $318,500. Most landed between $180,000 and $230,000.
Those are contract sums, not estimates. Every one of them was a fixed price agreed before we started.
Typical ranges, standard finish
300 sq ft, no kitchen
Living or dining room
$140k to $170k
420 sq ft, with kitchen
The most common brief
$180k to $230k
600 sq ft, with kitchen
Often with structural steel
$240k to $320k
What moves the price
Size matters less than people expect. Four things account for most of the spread.
✓
Finish level, especially the kitchen
✓
Ground conditions and slope
✓
How much of the old house wall comes out
✓
Access for machines and materials
“The finish level moves the price more than the size does.”
Three real examples
Maple Street extension
Rear extension, Denver, 22 weeks
$186,400
Alder Lane wrap
Side and rear, Lakewood, 26 weeks
$232,000
Birch Avenue second storey
Second storey, Arvada, 30 weeks
$318,500
What is not included
Furniture, landscaping beyond grading, and utility company fees. Everything else we can see and measure is in the number.
How to get a fixed number
Start with the estimator for a range. Then book a site visit, and you will have one fixed price in writing within ten days.