What a new home costs per square foot in 2026

Nora Whitcomb
Project director
·
30 September 2026
·
6 min read

A new home built to our standard finish costs between $340 and $420 per square foot around Denver this year.
The short answer
We finished 18 new homes in the last two years. Most landed between $340 and $420 per square foot, design included.
Those are contract sums, not estimates. Every one was a fixed price agreed before we started.
Typical ranges, standard finish
2,400 sq ft, 3 bedrooms
Flat lot
$820k to $1M
3,000 sq ft, 4 bedrooms
The most common brief
$1M to $1.25M
3,600 sq ft, 4 bedrooms
Often on a slope
$1.25M to $1.5M
What moves the price
Four things account for most of the spread.
✓
Slope and ground conditions
✓
Window area and glazing
✓
Kitchen and bathroom finish level
✓
Distance from Denver for crews and deliveries
“A sloping lot can add more to the price than an extra bedroom.”
Three real examples
Cedar Ridge house
3,400 sq ft, Evergreen, 11 months
$1.24M
Pine Hollow
3,100 sq ft, Golden, 12 months
$1.1M
Juniper Court
2,900 sq ft, Littleton, 10 months
$980,000
What is not included
Land, furniture, landscaping beyond grading, and utility company fees. Everything else we can see and measure is in the number.
How to get a fixed number
Start with the estimator for a range. Then book a site visit, and you will have one fixed price in writing within ten days.
Keep reading